Tadoba Express

Tadoba Express is an express train of the Indian Railways connecting Lokmanya Tilak Terminus in Maharashtra and Kazipet Junction of Telangana. It is currently being operated with 15603/15604 train numbers on a daily basis.[1][2] It is named after Tadoba Andhari Tiger Project.

Tadoba Weekly Express
Overview
Service typeExpress
First service8 August 2016 (2016-08-08)
Current operator(s)Central Railway zone
Route
StartLokmanya Tilak Terminus (LTT)
Stops27
EndKazipet Junction (KZJ)
Distance travelled1,153 km (716 mi)
Average journey time27 hours 30 minutes
Service frequencyWeekly[lower-alpha 1]
On-board services
Class(es)AC 2 tier, AC 3 tier, Sleeper Class, General Unreserved
Seating arrangementsNo
Sleeping arrangementsYes
Catering facilitiesNo
Entertainment facilitiesNo
Technical
Rolling stock2
Track gauge1,676 mm (5 ft 6 in)
Operating speed42 km/h (26 mph)
Route map

Service

The 11083/Tadoba Weekly Express has an average speed of 42 km/hr and covers 1153 km in 27 hrs 30 mins. 11084/Tadoba Weekly Express has an average speed of 39 km/hr and 1153 km in 29 hrs 30 mins.

Route and halts

The important halts of the train are:

Coach composite

The train consists of 15 coaches :

  • 1 AC II Tier
  • 3 AC III Tier
  • 6 Sleeper Coaches
  • 3 General
  • 2 Second-class Luggage/parcel van

Traction

Both trains are hauled by a Kalyan Loco Shed based WDP-4 diesel locomotive from Kurla to Kazipet.

Notes

  1. Runs one days in a week for every direction.

References


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.