Seville Metro line 2

The Line 2 of the Metro of Seville will span the city from east to west, connecting the neighbourhoods of La Cartuja and Torreblanca.

Torre Triana - Torreblanca
Overview
StatusIn planning phase
LocaleSeville
Stations18
Service
TypeRapid transit
SystemSeville Metro
History
OpenedTBD
Technical
Line length13,57 km
Track gauge1,435 mm (4 ft 8 12 in)

Description

Line 2 is still in the planning phase. Through a tunnel, it will travel the city from east to west. The line will begin in the neighbourhood of Torreblanca and will proceed to pass through Sevilla Este and el Palacio de Congresos, Montesierra, Tesalónica (with a line 4 connection expected), Kansas City, the central station of Santa Justa, José Laguillo (a planned line 3 station), la Plaza del Duque, the Plaza de Armas station, before finally crossing the river to Torre Triana (a planned line 4 station). The line will not have a direct transfer with line 1.

This line is of vital importance in terms of the trajectory that it spans, especially since it passes beneath the historic centre of the city and connects the international bus station of Plaza de Armas with the central railroad station of Santa Justa. Consequently, it has been though necessary to advance the modernization of the existing metro and railway installations, thereby providing a direct connection between the international bus station and the high velocity train (AVE) station of Santa Justa. It is estimated that the depth of the central segment will be more than 50 metres.

General characteristics expected

  • Method of construction: Tunnel boring machine, cut and cover, and surface.
    • Underground: 9,650 m
    • Street level: 3,920 m
    • Average depth: 25 m
  • Estimated cost: Between €1,032,000 and €1,233,000.
  • Municipalities served: One
  • Districts spanned: Five
  • Population served:
  • Annual users: Approximately 19,600,000
  • Daily users: Approximately 65,376

Stations

Line 
Torre Triana
Plaza de Armas
Plaza del Duque
Cristo de Burgos
José Laguillo
Santa Justa
Kansas City
San Pablo
Carretera Amarilla
Montesierra
Luis Uruñuela
Puerta Este
Palacio de Congresos
Ciencias
Adelfas
Aeronáutica
Polígono El Pino
Polígono Parsi
Parque Tecnológico
* Line in planning phase.
Out-of-system transfer planned.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.