Sainagar Shirdi–Kakinada Port Express

The 17205 / 17206 Sainagar Shirdi – Kakinada Port Express is an Express train belonging to Indian Railways South Coast Railway zone that run between Sainagar Shirdi and Kakinada Port in India.[1]

Sainagar Shirdi - Kakinada Port Express
Overview
Service typeExpress
LocaleMaharashtra, Karnataka, Telangana & Andhra Pradesh
First service16 August 2000 (2000-08-16)
Current operator(s)South Coast Railways
Route
StartSainagar Shirdi (SNSI)
Stops39
EndKakinada Port (COA)
Distance travelled1,338 km (831 mi)
Average journey time26 hours 45 mins
Service frequencyTri Weekly
Train number(s)17205 / 17206
On-board services
Class(es)AC 2 Tier, AC 3 Tier, Sleeper Class & General Unreserved
Seating arrangementsYes
Sleeping arrangementsYes
Catering facilitiesOn-board Catering
E-Catering
Observation facilitiesRake sharing with 17203/17204 Bhavnagar Terminus-Kakinada Port Express
Baggage facilitiesAvailable
Technical
Rolling stockICF Coaches
Track gauge1,676 mm (5 ft 6 in)
Operating speed51 km/h (32 mph) average including halts
Route map

Service

It operates as train number 17205 from Sainagar Shirdi to Kakinada Port and as train number 17206 in the reverse direction serving the states of Maharashtra, Karnataka, Telangana & Andhra Pradesh. The train covers the distance of 1,339 km (832 mi) in 22 hours 22 mins approximately at a speed of (50.5 km/h (31.4 mph)).

Coaches

The 17205 / 06 Sainagar Shirdi - Kakinada Port Express has two AC 2-tier, three AC 3-tier, ten sleeper class, four general unreserved & one SLR (seating with luggage rake) coaches . It does not carries a pantry car coach.

As with most train services in India, Coach Composition may be amended at the discretion of Indian Railways depending on demand.

Routing

The 17205/17206 Sainagar Shirdi - Kakinada Port Express runs from Sainagar Shirdi via Kopargaon, Manmad, Nagarsol, Aurangabad, Parbhani Junction, Parli Vaijnath, Latur Road Junction, Bidar, Vikarabad, Lingampalli, Secunderabad, Kazipet, Khammam, Vijayawada, Eluru, Rajahmundry, Samalkot, Kakinada Town to Kakinada Port.

Rake Sharing

17203 / 17204 - Bhavnagar Terminus - Kakinada Port Express

Traction

As This Route is going to be electrified, a Gooty Junction based diesel WDM 3D loco pulls the train to Secunderabad Junction, later a Vijayawada based WAP 4 electric locomotive pulls the train to its destination.

Coach Composition

Loco 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
SLRGENGENS1S2S3S4S5S6S7S8S9S10B1B2B3A1A2GENGENSLR

References

  1. , businessstandard.com, 21 April 2017
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.