Railway block code

The railway block signalling bell code is a system of bell rings used in Great Britain to communicate between manually operated Signal Boxes (the system is not used in modern power signal boxes, unless it is a fringe box to an older signalbox). Each signal box would have a bell circuit to the box on either side of it along the line. The equipment would consist of a plunger or tapper (rather like a Morse key) which if pressed, rings the bell in the neighbouring box. The neighbouring box would have a key for communicating back, therefore each box has a key which rings the bell in the other box. Where a signal box communicates with more than one other box (in either direction along the line, and possibly along a branch line too), each bell would have a different tone, so that the signalman could tell them apart by ear.

Examples

Although codes varied from region to region, the following shows a few selected standard UK bell codes:

Code Meaning
1 bell Call attention
2 bells Train entering section
2 - 3 bells (2 bells, pause, 3 bells) Is line clear for light engine?
2 - 2 - 1 Is line clear for empty coaching stock train?
3 Is line clear for stopping freight train?
3 - 1 Is line clear for stopping passenger train?
3 - 1 - 1 Is line clear for express freight train?
4 Is line clear for express passenger train?
4 - 1 Is line clear for mineral or empty wagon train?
2 - 1 Train arrived
3 - 3 Blocking back outside home signal
5 - 2 Release token [for single line sections only]
2 - 5 Token replaced
5 - 5 - 5 Opening signal box
7 - 5 - 5 Closing signal box
6 Obstruction danger
4 - 5 - 5 Train running away on Right Line
2 - 5 - 5 Train running away on Wrong Line
16 Testing bells and instruments

[1]

Typical use

These would be used as follows (assuming a simple exchange between two signal boxes on a plain section of line) between two signal boxes A and B. Assume a train is to pass from the block controlled by A to the block controlled by B. This must be agreed and permitted by the signalman in box B. Here is the sequence of bell codes and associated actions:

  1. Box A sends 1 bell to box B. (Call attention.)
  2. Box B replies with 1 bell to box A. (Acknowledgement, indicating readiness.)
  3. Box A sends 4 bells to box B. (Is line clear for express passenger train?)
  4. Box B sends 4 bells to box A. (Acknowledgement, if in the position to accept the train giving permission for box A to signal the train into the block controlled by B.)
  5. (when the signalled train enters the portion of line between A and B.) Box A sends 2 bells to box B. (Train entering section.) This is sent as the train passes box A and enters the block controlled by B.
  6. Box B sends 2 - 1 bells to box A. (Only after confirming that the train has arrived complete and no portion of it remains within the block section between A and B or the clearing point for that section. This could be done by the guard of the train notifying the signalman or by the signalman observing the tail-lamp.)

See also

  • Bell codes are used on multiple unit trains for communication between drivers and guards, but are not the codes listed above.
  • Whistle codes are used by railway engines to communicate with signal boxes and other staff.

References

  1. "BR Regulations for Train Signalling 1st Oct 1960"


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.