Qianjiang–Changde railway

The Qianjiang–Changde railway is an electrified railway in China.

Qianjiang–Changde railway
Overview
StatusOperational
TerminiQianjiang
Changde
Stations10
Service
TypeHeavy rail
History
Opened26 December 2019
Technical
Line length336 km (209 mi)
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed200 km/h (124 mph)[1]

History

Testing began on 14 October 2019.[2] The railway opened on 26 December.[3]

Stations

The line has the following passenger stations:

References

  1. "黔张常铁路环评报告获国家环保部批复 - 湖南频道". hn.rednet.cn. 14 August 2014. Retrieved 13 October 2020.
  2. "黔张常铁路开启动车组检测-湖南省人民政府门户网站". www.hunan.gov.cn. 15 October 2019. Retrieved 13 October 2020.
  3. "黔张常铁路正式通车_图片新闻_中国政府网". www.gov.cn. 26 December 2019. Retrieved 13 October 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.