Patimban Deep Sea Port
Patimban Deep Sea Port is an under construction sea port at Subang, West Java, Indonesia. It is located about 70 kilometers from the Karawang Industrial Estate and 145 kilometers from the city center of capital Jakarta, where many Japanese industrial firms, particularly automotive manufacturers operate. The port comprises a total area of 654 hectares in which 300 hectares will be specialized for intermodal containers and vehicle terminals while the remaining 354 hectares will be used as a back-up area. The port development is expected to be fully completed by 2027.[1] The port operation was officially inaugurated by President Joko Widodo on 20 December, 2020.[2]
Patimban port is expected to be Indonesia’s primary export port. It is also expected to solve the overcapacity of Tanjung Priok Port and traffic congestion in Jakarta from the transport of cargo.
History and Development
The deep sea port was planned to build at Cilamaya, but that was too close to an oil and gas field operated by Pertamina. It was decided to shift the location at Patimban in 2015.[3][4] There is already a small operating sea port at Patimban. Patimban Port would complement Tanjung Priok Port in the future. Patimban port is declared as a National Strategic Project to expedite the construction.[5]
Total cost of the project is estimated to cost Rp 43 trillion (US$3.29 billion) and the first phase of its construction will cost Rp 17 trillion (US$1.5 billion). Japan International Cooperation Agency (JICA) announced it was ready to sign a loan agreement with the government of Indonesia to finance the project.[6] The port is being built by a consortium of five companies: Japan's Penta-Ocean Construction, TOA Corporation, Rinkai Nissan Construction and Indonesian state-owned construction companies PT Wijaya Karya and PT Pembangunan Perumahan.
The port will be able to handle containers of 3.5 million twenty-foot equivalent units (TEUs) when the first stage is completed in 2020. The capacity will be expanded to 5.5 million TEUs in the second stage and then to 7.5 million TEUs in the final stage by 2027, which is half the capacity of Jakarta’s Tanjung Priok Port, the busiest port of Indonesia.[7]
Land transport
A toll road of approximately 37 kilometers from Cipali Toll Road will connect the port, which is expected to complete by June, 2020.[8]
See also
- List of Indonesian ports
- Ministry of Transportation, Indonesia
- Transport in Indonesia
- Subang Regency
References
- "Patimban port slated to begin operation in September". The Jakarta Post. Retrieved 17 February 2020.
- "Jokowi inaugurates $3b 'strategic' Patimban seaport"". The Jakarta Post. Retrieved 20 December 2020.
- "Indonesia Cancels Cilamaya Port Plan".
- "Government Cancels Cilamaya Port Construction". Tempo. Retrieved 2017-07-28.
- "Patimban Port Declared National Strategic Project". Jakarta Globe. Retrieved 2017-07-28.
- "'Patimban-T. Priok could compete with Singapore port'". The Jakarta Post. Retrieved 2017-07-28.
- "Pelindo II subsidiary eyes Patimban Port". The Jakarta Post. Retrieved 14 November 2019.
- "Indonesia Builds Special Port for Automotive Exports". Jakarta Globe. Retrieved 30 November 2019.