The Matiri Project is a hydroelectric scheme under construction by Pioneer Energy Limited at Lake Matiri and the Matiri River in the South Island of New Zealand.
Matiri Project | |
---|---|
Country | New Zealand |
Location | Matiri Valley, Tasman District |
Coordinates | 41°39′43″S 172°20′4″E |
Status | Proposed |
Owner(s) | New Zealand Energy Limited |
Thermal power station | |
Primary fuel | Hydropower |
Power generation | |
Nameplate capacity | 4.6 MW |
The scheme was opposed by environmentalists and kayakers some of whom were angry that the resource consents were not notified nationwide.[1] The proposal was approved and it included a concession granted by the Department of Conservation to build structures on public land. Forest and Bird did not see that there would be any conservation gain in giving the approval.[2]
References
- Kidson, Sally (25 September 2008). "Split over Lake Matiri hydro plan". Nelson Mail. Retrieved 30 October 2008.
- Murdock, Helen (26 May 2011). "DOC's hydro approval damns bats". Nelson Mail. Retrieved 26 May 2011.