MK Fintel Wind

MK Fintel Wind is a Serbian renewable energy company. It is a joint venture between MK Group and the Italian Fintel Energia Group.

MK Fintel Wind
TypeJoint-stock company
IndustryElectric utility
Founded6 March 2008 (2008-03-06)
Headquarters,
Area served
Serbia
Key people
Tiziano Giovannetti (General director)
OwnerFintel Energia Group S.p.A. (54.00%)
MK Group (46.00%)
Footnotes / references
Business ID: 20392126
Tax ID: 105512758

History

MK Fintel Wind was established on 6 March 2008.

The company was the first to build and operate wind farms in Serbia.[1][2] As of September 2016, the company had two wind farms in Serbia ("Kula" and "La Piccolina"), with 16.5 MW of installed capacity.[3][4]

In February 2018, MK Fintel Wind announced that it has signed an 81.5 million euros loan to finish the first phase of the construction of Košava wind farm, located near the city of Vršac.[5][6] On September 23, 2019, "Košava 1" wind farm with capacity of 69 MW was opened; it was company's third opened wind farm in Serbia.[4]

See also

References

  1. "Serbia installs first wind project". Wind Power Monthly.
  2. "Serbia's first wind park launched at Kula". Balkan Green Energy News.
  3. "MK Fintel Wind to complete works on 6.6 MW wind park in Serbia by end-Aug". SeeNews Renewables.
  4. "Kompanija MK Fintel Wind pustila u rad vetropark "Košava" kod Vršca". n1info.com (in Serbian). Beta. 24 September 2019. Retrieved 28 September 2019.
  5. "MK Fintel Wind agrees 81.5 mln euro loan for Kosava wind farm". renewablesnow.com. 27 February 2018. Retrieved 17 March 2018.
  6. "MK Fintel Wind obezbedio 81,5 miliona evra kredita za nastavak gradnje vetroelektrane kod Vršca". seebiz.eu (in Serbian). Beta. 27 February 2018. Retrieved 17 March 2018.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.