Line 3 (Rio LRT)

Line 3: Central ↔ Santos Dumont is a LRT line on VLT Carioca system, located in Rio de Janeiro, Brazil.

Rio de Janeiro LRT Line 3
LRT leaving Line 1 and accessing Line 3
Overview
StatusOperational
Owner Prefecture of Rio de Janeiro
LocaleRio de Janeiro, Brazil
TerminiCentral
Santos Dumont
Stations10
Service
SystemRio de Janeiro Light Rail
Operator(s)Concessionária do VLT Carioca S.A.
History
Opened26 October 2019
Technical
Line length1.8 km (1.1 mi)
CharacterAt-grade
Track gauge1,435 mm (4 ft 8 12 in)
ElectrificationThird rail
Operating speed15 km/h (9.3 mph) (average)
50 km/h (31 mph) (maximum)
Route map

 2  to Praia Formosa
Central
 2  to Praça XV
Cristiano Ottoni/Pequena África
Camerino/Rosas Negras
Santa Rita/Pretos Novos
 1  to Praia Formosa
Candelária
 2  to Praia Formosa
 2  to Praça XV
Sete de Setembro
Carioca
Cinelândia
Antônio Carlos
Santos Dumont

It has 10 stops, all at-grade, 6 of them connected with Line 1 (including terminal station Santos Dumont), 1 with Line 2 (terminal station Central), and 3 more for Line 3: Santa Rita/Pretos Novos, Camerino/Rosas Negras and Cristiano Ottoni/Pequena África.[1]

The name of the stops of the line was changed to pay tribute to African descent movements and historical monuments connected to the African culture along the way, besides having only geographic references. Cristiano Ottoni/Pequena África was named after the square where the station is located and the area in the district of Centro, where are located the main locations for appreciation to the African culture and heritage. Camerino/Rosas Negras was named after Rua Camerino and the women movements against the slavery and in favor of the black people rights in the end of the 19th century and beginning of 20th century. Santa Rita/Pretos Novos was named after the cemetery located in the area, discovered during the line construction.[2][3]

The line is in tests since November 2018,[4] but problems between Rio's Prefecture and the LRT operating consortium didn't allow the line to enter in operation.[5] It was opened on 26 October 2019.[6]`

Station

Central → Santos Dumont

# Name Opening District Connections
1 Central 20 October 2017 Centro LRT Line 2
MetrôRio Lines 1 and 2
SuperVia Central do Brasil
Col. Américo Fontenelle Road Terminal
Providência Gondola Lift
2 Cristiano Ottoni/Pequena África 26 October 2019 Centro
3 Camerino/Rosas Negras 26 October 2019 Centro MetrôRio Lines 1 and 2
4 Santa Rita/Pretos Novos 26 October 2019 Centro
5 Candelária 5 June 2016 Centro LRT Line 1
6 Sete de Setembro 5 June 2016 Centro LRT Lines 1 and 2
7 Carioca 5 June 2016 Centro LRT Line 1
MetrôRio Lines 1 and 2
8 Cinelândia 5 June 2016 Centro LRT Line 1
MetrôRio Lines and 2
9 Antônio Carlos 5 June 2016 Centro LRT Line 1
10 Santos Dumont 5 June 2016 Centro LRT Line 1
Santos Dumont Airport

Santos Dumont → Central

# Name Opening District Connections
1 Santos Dumont 5 June 2016 Centro LRT Line 1
Santos Dumont Airport
2 Antônio Carlos 5 June 2016 Centro LRT Line 1
3 Cinelândia 5 June 2016 Centro LRT Line 1
MetrôRio Lines 1 and 2
4 Carioca 5 June 2016 Centro LRT Line 1
MetrôRio Lines 1 and 2
5 Sete de Setembro 5 June 2016 Centro LRT Lines 1 and 2
6 Candelária 5 June 2016 Centro LRT Line 1
7 Santa Rita/Pretos Novos 26 October 2019 Centro
8 Camerino/Rosas Negras 26 October 2019 Centro MetrôRio Lines 1 and 2
9 Cristiano Ottoni/Pequena África 26 October 2019 Centro
10 Central 20 October 2017 Centro LRT Line 2
MetrôRio Lines 1 and 2
SuperVia Central do Brasil
Col. Américo Fontenelle Road Terminal
Providência Gondola Lift

References

  1. "VLT Carioca realiza testes para a operação da Linha 3" (in Portuguese). VLT Carioca. 22 November 2018. Retrieved 12 August 2019.
  2. Fortuna, Maria (7 December 2018). "Novas paradas do VLT farão homenagens à cultura africana" (in Portuguese). O Globo. Retrieved 12 August 2019.
  3. "Viagem-teste oficializa nomes das novas paradas do VLT" (in Portuguese). VLT Carioca. 11 December 2018. Retrieved 12 August 2019.
  4. Ávila, Edimilson (22 November 2018). "Linha 3 do VLT entra em testes; promessa é começar a circular em dezembro" (in Portuguese). G1. Retrieved 12 August 2019.
  5. Haidar, Diego (10 May 2019). "Linha 3 do VLT está pronta, mas não entrou em operação por falta de autorização da prefeitura do Rio" (in Portuguese). G1. Retrieved 12 August 2019.
  6. "Linha 3 do VLT do Rio começa a circular; veja o mapa do sistema" (in Portuguese). G1. 26 October 2019. Retrieved 22 December 2019.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.