Line 3 (Nanning Metro)

Line 3 of the Nanning Metro is a rapid transit line in Nanning. The line opened on 6 June 2019. The line is 27.9 km long with 23 stations.

Line 3
 3 
Qingxiushan station
Overview
StatusOperational
OwnerNanning
LocaleNanning, Guangxi, China
TerminiKeyuan Dadao
Pingliang Overpass
Stations23
Service
TypeRapid transit
SystemNanning Metro
Services1
Operator(s)Nanning Rail Transit Corporation
Rolling stock6-car Type B
History
OpenedJune 6, 2019 (2019-06-06)
Technical
Line length27.9 km (17.34 mi)[1]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8 12 in)
Line 3
Chinese name
Simplified Chinese南宁地铁3号线
Traditional Chinese南寧地鐵3號線
Zhuang name
ZhuangNanzningz Didez 3 Hauhsienq

Opening timeline

SegmentCommencementLengthStation(s)Name
Keyuan Dadao — Pingliang Overpass 6 June 2019 27.9 km (17.34 mi)[1] 22
Donggouling 10 September 2020[2] Infill station 1

Stations

Station name Transfer Distance
km
Location
English Chinese Zhuang
Keyuan Dadao 科园大道 Daihloh Gohyenz
Chuangye Lu 创业路 Roen Cangyez
Anji Coach Station 安吉客运站 Camh Yinhhek Anhgiz  2 
Beihubei Lu 北湖北路 Roen Baek Bwzhuz
Xiufeng Lu 秀峰路 Roen Siufungh
Yongwu Lu 邕武路 Roen Yunghvuj
Dajicun 大鸡村 Dagihcunh
Xinggui Lu 兴桂路 Roen Hinghgvei
Xiaojicun 小鸡村 Siujgihcunh
Donggouling 东沟岭 Dungruhlingj
Changgang Lu 长堽路 Roen Cangzgangh
Dongge Lu 东葛路 Roen Dunghgoz
Binhu Lu 滨湖路 Roen Binhhuz
Jinhu Square 金湖广场 Ginhhuz Gvangjcangz  1 
Langxi 埌西 Langsih
Qingzhu Overpass 青竹立交 Cinghcuz Lizgyauh
Qingxiushan 青秀山 Cinghsiusanh
Nanning Museum 市博物馆 Si Bozvuzgvanj
Advanced Business Park 总部基地 Cungjbu Gihdi
Guangxi Planning Exhibition Hall 广西规划馆 Gvangjsih Gveihva’gvanj
Qingge Lu 庆歌路 Roen Ginggoh
Wuxianghu 五象湖 Vujsienghuz
Pingliang Overpass 平良立交 Bingzliengz Lizgyauh

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.