Golen Gol Hydropower Project

Golen Gol Hydropower Plant (GGHPP) is a hydroelectric power plant located on Golen Gol River - a major left tributary of Mastuj River[3][4] in Chitral District of Khyber Pakhtunkhwa province of Pakistan.[5] The dam is located approximately 25 km from Chitral city, and 365 km from provincial capital of Peshawar. Construction of Golen Gol project began in 2011, and was completed in January 2018.

Golen Gol Hydropower Plant
Location of Golen Gol Hydropower Plant in Pakistan
Official nameGolen Gol Hydropower Plant
LocationChitral District of KPK , Pakistan
Coordinates35°55′16.17″N 072°00′51.64″E
StatusCompleted & Operational [1] [2]
Construction beganJanuary 2011
Opening dateJanuary 2018
Owner(s)Water and Power Development Authority (WAPDA)
Dam and spillways
Type of damGravity, roller-compacted concrete
ImpoundsGolen Gol River
Height12 m (39 ft)
Length60 m (200 ft)
Golen Gol Hydroelectric Plant
Coordinates36°6′55″N 73°55′0″E
Operator(s)WAPDA
Commission dateJanuary 2018
Turbines3 x 35.3 MW Pelton-type
Installed capacity106 MW
Annual generation436 GWh

Construction and background

Golen Gol Hydropower Project is a run-of-the-river project designed for the generation of 108 MW consisting of three vertical Pelton wheel turbine units in one phase with average energy output of 436 Gwh.[6] Golen Gol Hydropower Project is a part of least-cost energy generation plan, being executed by WAPDA to harness the indigenous hydropower resources of the country. WAPDA awarded the contract to SAMBU-SARCO joint venture comprising a Korean and a Pakistani firm.[7] Sambu, an independent power provider (IPP), won the project in the last quarter of 2010 and construction work started in Jan 2011[8]

Sambu has already successfully completed Pakistan's first IPP hydropower plant, 84MW New Bong Escape Hydropower Project, which is commercially operational since March 2013. Korean company has also been awarded a contract to construct Pakistan's third IPP hydropower plant, 100MW Gulpur Hydropower Project on BOOT (Build, Own, Operate, Transfer) basis Joint Venture with other Korean firm and execution of work is in progress.[9]

The Saudi Fund for Development is the major source of funding for the 108-MW Golen Gol hydropower project being developed by Pakistan's WAPDA. The Golen Gol project is also being funded by the Kuwait Fund for Arab Economic Development (KFD) and Organization of the Petroleum Exporting Countries (OPEC).[10] Saudi Fund, Kuwait Fund and Opec Fund are providing $107 million for the construction of GGHPP.[11]

The Electro-Mechanical works of the Golen Gol Project were awarded to Andritz Hydro, the world leader and renowned supplier of hydro power equipment and services. The Project is based on the state of the art, water to wire concept developed by Andritz Hydro for the supply, installation and commissioning of the hydro power plants. Andritz hydro completed the similar projects namely Allai Khwar and Duber Khwar in North of Pakistan within the record lowest time period and thus providing timely and precious power supply to the country and considerable early revenue generation to WAPDA.

Major benefits and uses

On its completion, Golen Gol Hydropower project will generate about 436 Mega Units (GWH) of inexpensive electricity annually to earn revenue of about Rs 1 billion. Being an environment friendly hydropower project, it will help reduce dependence on expensive thermal power, thereby saving foreign exchange amounting to $34 million (equivalent to Rs 3 billion) to the country. According to estimation, Golen Gol hydropower project will add about Rs 9 billion per annum to the national economy through socio-economic uplift in the country caused by the project.[12]

Construction of Golen Gol Hydropower Plant was commenced in June 2009 and the project is expected to be completed in October 2017. The total cost of the project is about PKR 16 billion.[13] Golen Gol Hydropower Project is part of the least-cost energy generation plan of the Government of Pakistan. It is being executed by Wapda on priority basis to harness indigenous hydropower resources to improve the ratio of hydel electricity in the national grid and providing relief to the consumers.[14]

Salient features

Type: Concrete Diversion Weir
Diversion Weir Length: 60 m.
Diversion Weir Height: 12 m.
Design Discharge: 30 Cusecs
Headrace Tunnel Length: 3800m long, 3.7m in diameter
Gated Flushing Section Width: 19.72m
Sand Trap: 83.7m
Headrace Channel: 102m
Vertical and pressure shaft: 970m long, 2.5m dia
Surge Chambers: 42m high, 15m dia
Installed Capacity: 108 MW
Average Annual Energy Production: 436 GWh[15][16]

The Intake weir will be about 1 km upstream of Babuka village. From the intake there will be a headrace channel leading to the tunnel, which will discharge the flow into the surge chamber and a combination of vertical and horizontal pressure shafts from where water flows to the surface powerhouse which is located on the left bank of Mastuj River, just downstream from the confluence of the Golen Gol and the Mastuj River.[17]

See also

References

  1. https://khybernews.tv/pm-abbasi-inaugurates-golen-gol-hydropower-plant-in-chitral/
  2. https://www.geo.tv/latest/180251-pm-addresses-golen-gol-hydropower-project-inauguration-ceremony-in-chitral/
  3. http://www.nation.com.pk/business/01-Oct-2011/Wapda-gears-up-work-on-hydropower-projects
  4. "Archived copy". Archived from the original on 2014-07-03. Retrieved 2014-03-26.CS1 maint: archived copy as title (link)
  5. http://www.pakistantoday.com.pk/2010/12/28/business/wapda-inks-hydroelectric-agreement/
  6. https://www.devex.com/projects/tenders/golen-gol-hydropower-project-in-pakistan/48966
  7. http://www.thefreelibrary.com/Rs.7.52b+agreement+signed+for+106-MW+Golen+Gol+Project.-a0245328034
  8. http://www.brecorder.com/agriculture-a-allied/183/1237094/?tmpl=component&print=1&layout=default&page=
  9. http://www.brecorder.com/agriculture-a-allied/183/1237094/?tmpl=component&print=1&layout=default&page=
  10. http://www.hydroworld.com/articles/2013/11/saudi-fund-increases-financing-for-pakistan-s-golen-gol-hydropower-plant.html
  11. http://www.nation.com.pk/business/01-Oct-2011/Wapda-gears-up-work-on-hydropower-projects
  12. http://www.nation.com.pk/business/01-Oct-2011/Wapda-gears-up-work-on-hydropower-projects
  13. "Archived copy". Archived from the original on 2014-05-27. Retrieved 2014-03-26.CS1 maint: archived copy as title (link)
  14. http://www.dawn.com/news/1057328/57m-saudi-fund-for-golen-gol-power-project
  15. http://peshawar.nelaam.com/38198.php
  16. "Archived copy". Archived from the original on 2014-05-27. Retrieved 2014-03-26.CS1 maint: archived copy as title (link)
  17. "Archived copy". Archived from the original on 2014-05-27. Retrieved 2014-03-26.CS1 maint: archived copy as title (link)
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.