Bavarian G 4/5 H

The steam engines of Class G 4/5 H operated by the Royal Bavarian State Railways were the most powerful of the German, 2-8-0, freight locomotives.

Bavarian G 4/5 H
DRG Class 56.8–11
Number(s)
  • Bavaria: 5151–5160, 5501–5695, 5211–5235
  • DRG: 56 801 – 56 809, 56 901 – 56 1035, 56 1101 – 56 1125
Quantity230
Manufacturer
Year(s) of manufacture1915–1919
Retired1933–1947
Wheel arrangement2-8-0
Axle arrangement1′D h4v
TypeG 45.16
Track gauge1,435 mm (4 ft 8 12 in)
Length over buffers18,250 mm (59 ft 10 12 in)
Service weight76.6 t (75.4 long tons; 84.4 short tons)
Adhesive weight63.6 t (62.6 long tons; 70.1 short tons)
Axle load15.9 t (15.6 long tons; 17.5 short tons)
Top speed60 km/h (37 mph)
Driving wheel diameter1,270 or 1,300 mm (4 ft 2 in or 4 ft 3 18 in)
Leading wheel diameter850 or 880 mm (2 ft 9 12 in or 2 ft 10 58 in)
No. of cylindersFour (compound)
LP cylinder bore620 mm (24 716 in)
HP cylinder bore400 mm (15 34 in)
Piston stroke610 and 640 mm (24 and 25 316 in) or 610 and 620 mm (24 and 24 716 in)
Boiler Overpressure16 kgf/cm2 (1.57 MPa; 228 lbf/in2)
Grate area3.30 m2 (35.5 sq ft)
Superheater area61.70 m2 (664.1 sq ft)
Evaporative heating area178.50 or 241.60 m2 (1,921.4 or 2,600.6 sq ft)
Tenderbay 3 T 20.2
Tender service weight46.5 t (45.8 long tons; 51.3 short tons)
Water capacity20.2 m3 (4,400 imp gal; 5,300 US gal)
Fuel6.5 t (6.4 long tons; 7.2 short tons) coal

The locomotive works of Maffei in Munich based its design on principles developed in-house by Hammel and Leppla, which had already proved themselves well on the Bavarian S 3/6. In fact there is a clear line of development for Maffei locomotives from the twin-cylinder Bavarian G 4/5 N through the C 4/5s built for the Swiss Gotthard railway and the Baden VIII e delivered to the Grand Duchy of Baden State Railways to the G 4/5 H.

The locomotives had a superheated, four-cylinder, compound engine and a bar frame, like most other Bavarian four-cylinder compounds, which simplified access to the inside driving gear. All four cylinders drove the second coupled axle. The leading axle was of the Adams type.

Between 1915 and 1919 195 engines were built by Maffei and Krauss for the Royal Bavarian State Railways. Another 10 locomotives were ordered by the Imperial Railway Office (Reichseisenbahnamt) for MGD Brussels and 25 by the Head of Military Railways for war service and which were taken over by Bavaria after the First World War. 48 engines were transferred to France in 1919, as part of the ceasefire agreement, and 13 went to Belgium. The remaining 169 engines left in Germany were renumbered by the Deutsche Reichsbahn to 56 801–809, 56 901–1035 und 56 1101–1125.

Due to falling demand for transportation during the worldwide economic crisis, the electrification of lines in south Bavaria and the restationing of simpler, Prussian goods locomotives to Bavaria in great numbers the G 4/5 H was retired very quickly. This began as early as 1933 and was carried through so rapidly that by the beginning of the Second World War there were only 5 examples left. Two engines survived the war, but were retired and scrapped in 1947. The actual reasons for the premature retirement of this class can only be speculated upon today, but it may at least in part have been due to the opposition of the influential head of the construction department, Richard Paul Wagner, to "south German" four-cylinder, compound locomotives.

The G 4/5 Hs were coupled with tenders of Class bay 3 T 20.2 which, after the G 4/5 H's early retirement, were often attached to Prussian G 10 locomotives stationed in Bavaria because they were still relatively new and had a large capacity.

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.