Aviation/96th Street station

LAX/Metro Transit Center is an under-construction infill light rail transport hub in the Los Angeles County Metro Rail system, located near the intersection of Aviation and 96th Street in the Westchester district of Los Angeles. The station was designed as a station for the Crenshaw/LAX Line[3] and the new terminal station of the C Line.[4] In 2014, LAWA and the LA Metro committee approved a plan for a people mover to the LAX airport terminals, which will connect to Metro at this station.

LAX/Metro Transit Center
 
Coordinates33°56′59.5″N 118°22′43.3″W
Owned byMetro and LAWA (Los Angeles World Airports)
Line(s)  
Platforms1 island platform (Metro)
1 island platform (APM)
Tracks4 (2 Metro)
2 APM
Connections LAX Automated People Mover[1]
Construction
Bicycle facilitiesTBD
Disabled accessYes
Other information
StatusUnder construction[2]
History
Opening2023
Future services
Preceding station Metro Rail Following station
Westchester/Veterans Crenshaw/LAX Line Aviation/Century
Terminus
Preceding station LAWA Following station
Intermodal Transportation Facility West
towards West CTA
LAX Automated People Mover Consolidated Rent-A-Car-Center
Terminus
Location

Plans for both the new airport station and the Aviation/Century station continue. The Century railroad bridge was demolished on July 25, 2014. The LAX/Metro Transit Center station is currently under construction and slated to open in 2023.

Station layout

L4
LAX People Mover platforms
Westbound ← LAX People Mover (under construction) toward Terminals 3/4/TBIT (ITF West)
Island platform, doors will open on the left
Eastbound LAX People Mover (under construction) toward CONRAC Terminus
L3
Metro Rail platforms
Northbound  Crenshaw/LAX Line (under construction) toward Expo/Crenshaw (Westchester/Veterans)
Island platform, doors will open on the left and right
Southbound  Crenshaw/LAX Line (under construction) toward Aviation/Century (Terminus)
L2 Mezzanine Faregates, Ticket machines
G Street level Exit/entrance, ITF East, Metro Bus Plaza, Metro Bike Hub

Future rail transfers

Metro has proposed to make this station the terminus for the rapid transit Sepulveda Pass Corridor. Metro in the route planning stage for phase one as of 2019. The station is expected to be the terminus of the second phase of construction with completion planned for around 2040.

References

  1. "Metro Board approves new station at Aviation/96th as best option to connect to LAX automated people mover". The Source. Metro (LACMTA). June 26, 2014. Retrieved 2014-06-26. Should LAWA move the people mover alignment back to 98th Street — as was previously studied — Metro would seek to make the Aviation/Century station as the primary connection point to the people mover.
  2. "LAX people mover breaks ground". masstransitmag.com. March 25, 2019. Retrieved October 5, 2019.
  3. Hymon, Steve (August 18, 2016). "Subway turnback, Airport Connector receive state cap-and-trade funds". The Source.
  4. England-Nelson, Jordan (June 26, 2014). "New Metro station approved that will link LAX with metro rail system". DailyBreeze.com.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.